======Services Completed by Batches====== * Please note that this page is under construction. * If the service done by your bacth to the Faculty is not listed here, please inform the same to webmaster.pefaa@gmail.com. Please make a Google Document with the details and photos of the service and send the link to us. If not please send the details so that we can update. ====E17 Batch==== ====E16 Batch==== ====E15 Batch==== ====E14 Batch==== ====E13 Batch==== ====E12 Batch==== ====E11 Batch==== ====E10 Batch==== ====E09 Batch==== ====E08 Batch==== ====E07 Batch==== ====E06 Batch==== ====E05 Batch==== ====E04 Batch==== ====E03 Batch==== ====E02 Batch==== ====E01 Batch==== ====E00 Batch==== ====E99 Batch==== ====E98 Batch==== ====E97 Batch==== ====E96 Batch==== ====E95 Batch==== ====E94 Batch==== ====E93 Batch==== ====E92 Batch==== ====E91 Batch==== ====E90 Batch==== ====E89 Batch==== ====E88 Batch==== ====E87 Batch==== ====E86 Batch==== ====E85 Batch==== ====E84 Batch==== ====E83 Batch==== ====E82 Batch==== ====E81 Batch==== ====E80 Batch==== ====E79 Batch==== ====E78 Batch==== ====E77 Batch==== ====E76 Batch==== ====E75 Batch==== ====E74 Batch==== ====E73 Batch==== ====E72 Batch==== ====E71 Batch==== ====E70 Batch==== ===2016: Starting EFAC7075 Fund of Rs. 3.2 million for Student Grants=== *[[https://docs.google.com/document/d/1nrpnzW6sab68q9r0YF6ihNixxo68-Xjy4vmhj4d2AB8/edit?usp=sharing|Read More..]] ====E69 Batch==== ===2019-10 -04 :Installing Multimedia System and Audio-Visual Control Room of the EOE Pereira Theater=== *The existing projector room of the theater was refurbished to make it an Audio/Visual control room bringing all cables and controllers to the room. This will facilitate to run the functions smoothly. This was completed by E69-75 batch and handed over to the Faculty on 4-10-2019 on their 50th anniversary of admission. The existing projector screen had wrinkles and hence it was replaced. A new multimedia projector with wall patch panels and A/V switcher was installed at the control room. The total cost is Rs. 3.0 million. ====E68 Batch==== ====E67 Batch==== ====E66 Batch==== ===2019-08-17: Refurbishment of the Faculty Board Room=== *Refurbishment of the Board Room by providing new furniture, two multimedia projectors, screens a sound system with 3 Goose neck mics for the head table and two wireless mics was done by E69 (Graduation) batch on 17-08-2019 commemorating their 50th Anniversary of Graduation. ===2016: Establishing a Conference Room === ===2008: Establishing Seminar Room 1=== ====E65 Batch==== ====E64 Batch==== ====E63 Batch==== ====E62 Batch==== ====E61 Batch==== ====E60 Batch==== ====E59 Batch==== ====E58 Batch==== ====E57 Batch==== ====E56 Batch==== ====E55 Batch==== ====E54 Batch==== ====E53 Batch==== ====E52 Batch==== ====E51 Batch==== ====E50 Batch====