Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
services_completed_-_by_batches [2019/10/15 10:59]
S.M.K.B. Samarakoon [E69 Batch]
services_completed_-_by_batches [2020/12/22 12:18] (current)
Line 50: Line 50:
 ====E71 Batch==== ====E71 Batch====
 ====E70 Batch==== ====E70 Batch====
-  *[[https://docs.google.com/document/d/1nrpnzW6sab68q9r0YF6ihNixxo68-Xjy4vmhj4d2AB8/edit?usp=sharing|EFAC7075 Fund of Rs3.2 million for Student Grants was started 2016]]+===2016: Starting EFAC7075 Fund of Rs. 3.2 million for Student Grants=== 
 +  *[[https://docs.google.com/document/d/1nrpnzW6sab68q9r0YF6ihNixxo68-Xjy4vmhj4d2AB8/edit?usp=sharing|Read More..]]
  
 ====E69 Batch==== ====E69 Batch====
 +===2019-10 -04 :Installing Multimedia System and Audio-Visual Control Room of the EOE Pereira Theater===
   *The existing projector room of the theater was refurbished to make it an Audio/Visual control room bringing all cables and controllers to the room. This will facilitate to run the functions smoothly. This was completed by E69-75 batch and handed over to the Faculty on 4-10-2019 on their 50th anniversary of admission. The existing projector screen had wrinkles and hence it was replaced. A new multimedia projector with wall patch panels and A/V switcher was installed at the control room. The total cost is Rs. 3.0 million.   *The existing projector room of the theater was refurbished to make it an Audio/Visual control room bringing all cables and controllers to the room. This will facilitate to run the functions smoothly. This was completed by E69-75 batch and handed over to the Faculty on 4-10-2019 on their 50th anniversary of admission. The existing projector screen had wrinkles and hence it was replaced. A new multimedia projector with wall patch panels and A/V switcher was installed at the control room. The total cost is Rs. 3.0 million.
 ====E68 Batch==== ====E68 Batch====
 ====E67 Batch==== ====E67 Batch====
 ====E66 Batch==== ====E66 Batch====
 +===2019-08-17: Refurbishment of the Faculty Board Room===
 +  *Refurbishment of the Board Room by providing new furniture, two multimedia projectors, screens a sound system with 3 Goose neck mics for the head table and two wireless mics was done by E69 (Graduation) batch on 17-08-2019 commemorating their 50th Anniversary of Graduation.
 +
 +===2016: Establishing a Conference Room ===
 +
 +===2008: Establishing  Seminar Room 1===
 +
 ====E65 Batch==== ====E65 Batch====
 ====E64 Batch==== ====E64 Batch====
Last modified: le 2020/12/22 12:18