Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
services_in_need [2019/01/24 21:06]
S.M.K.B. Samarakoon [Refurbishment and/or improving wash room facilities]
services_in_need [2020/12/22 12:18] (current)
Line 4: Line 4:
 =====Academic support=====  =====Academic support=====
 ====Building a Student, Exam and Results  Management System==== ====Building a Student, Exam and Results  Management System====
-  * We do not have a proper student management system for the Faculty. PEFAA was instrumental in purchasing a software by paying annually 1000 USD as a pilot project using funds provided by the  Alumni in Australia. However it is found that ready made software is not capable of handling the stringent and also ad-hoc requirement of the Faculty. So the only option is to develop such a system. For that we need to pay for a computer programmer may be for one year. The cost would be about Rs. 1.2 million +  * The Faculty do not have a proper student management system for the Faculty. PEFAA was instrumental in purchasing a software by paying annually 1000 USD as a pilot project using funds provided by the  Alumni in Australia. However it is found that ready made software is not capable of handling the stringent and also ad-hoc requirement of the Faculty. So the only option is to develop such a system. For that we need to pay for a computer programmer may be for one year. The cost would be about Rs. 1.2 million 
-====Building a Lecture Recording System==== + 
-  *With the advanced digital technology, the function of a class room lectures is being changed drastically. Instead of traditional teacher centered learning, flipped class room model is being promoted. Now the lectures can pre-record lectures and students study at their phase, lecturers can guide them. The classes will be used more to discuss problems. For that we need to subscribe to a lecture recording service. At present Director, EEU has requested such services to send their quotations. We will update the costs as soon as we receive them. Please contact PEFAA if you are interested to support this project.  +====Installing Lecture Recording Systems==== 
 +  *With the advanced digital technology, the function of a class room lectures is being changed drastically. Instead of traditional teacher centered learning, flipped class room model is being promoted. Now the lectures can pre-record lectures and students study at their phase, lecturers can guide them. The classes will be used more to discuss problems. For that we need to subscribe to a lecture recording service. The Faculty needs to identify  suitable technology too. Please contact PEFAA if you are interested to support this project.  
  
 ====Providing computers for all lecture rooms==== ====Providing computers for all lecture rooms====
Line 14: Line 15:
 =====Infrastructure development===== =====Infrastructure development=====
 ====EOE Pereira Theater==== ====EOE Pereira Theater====
 +  *The existing projector room of the theater was refurbished to make it an Audio/Visual control room bringing all cables and controllers to the room. This will facilitate to run the functions smoothly. This was completed by E69-75 batch and handed over to the Faculty on 4-10-2019 on their 50th adversary (of admission). The existing projector screen had wrinkles and hence it was replaced. A new  multimedia projector with wall patch panels and A/V switcher was installed at the control room. The total cost is Rs. 3.0 million. [[https://pefaa.net/services_completed_-_by_batches#e69_batch|Click to read more..]]
   *There is no proper stage lighting system for EOE Pereira Theater.   Professional stage lighting system is required for the functions held in the  theater. The estimated cost is about  Rs. 3 million  and may be implemented in stages spending  Rs. 1 million at a time.   *There is no proper stage lighting system for EOE Pereira Theater.   Professional stage lighting system is required for the functions held in the  theater. The estimated cost is about  Rs. 3 million  and may be implemented in stages spending  Rs. 1 million at a time.
-  *The sound system of EOE Pereira Theater is more than 35 years old. It is proposed to install a professional grade array speaker system. The estimated cost is 1.5 million Rupees+ VAT. +  *The sound system of EOE Pereira Theater is more than 35 years old. It is proposed to install a professional grade array speaker system. The estimated cost is 2.5 million Rupees.
-  *It is proposed to improve the existing projector room of the theater to make it a Audio/Visual control room bringing all cables and controllers to the room. This will facilitate to run the functions smoothly. The estimated cost is Rs. 500,000  +
-  *The existing projector screen has wrinkles and need to be replaced. The cost would be around Rs 1 million.+
   *Refurbishment of ceiling   *Refurbishment of ceiling
-  *Improving the ventilation system. 
   *Fixing elegant controllable ambient lighting system.   *Fixing elegant controllable ambient lighting system.
  
 ====Faculty Board Room==== ====Faculty Board Room====
-  *[[https://drive.google.com/open?id=1CwPqb6XDMHHvAewS6pbZ25QVmky8Bphf|Refurbishment of the Board Room by providing new furniture, multimedia and conference system.]]+  *Refurbishment of the Board Room by providing new furniture, two multimedia projectors,  screens a sound system with 3 Goose neck mics for the head table and two wireless mics was done by E69 (Graduation) batch on 17-08-2019 commemorating their 50th Anniversary of Graduation. [[https://pefaa.net/services_completed_-_by_batches#e66_batch|Click to read more..]]
  
 ====Audio and Video facilities==== ====Audio and Video facilities====
Line 29: Line 28:
  
 ====Refurbishment and/or improving wash room facilities==== ====Refurbishment and/or improving wash room facilities====
-  *[[https://drive.google.com/drive/folders/1CZNZ3bdOhL_XSV9sJe8Xtb4s_jO4EJMv?usp=sharing|Wash room in the structures laboratory (need major refurbishment)]] +  *Wash room in the structures laboratory needs major refurbishment. [[https://drive.google.com/drive/folders/1CZNZ3bdOhL_XSV9sJe8Xtb4s_jO4EJMv?usp=sharing|Click for details]] 
-  *Wash room near the library (need major refurbishment) +  *Wash room near the library needs major refurbishment. 
-  *Three wash rooms on the main corridor (need to install automatic washing systems)  to buy and install only the units from AliExpress would cost about Rs100,000+  *Installing automatic flushing systems  in three wash rooms on the main corridor The estimated cost is Rs.200,000.
  
 ====Improvement of Mechanical Engineering Laboratories==== ====Improvement of Mechanical Engineering Laboratories====
 +Sierra company has donated Rs.150,000
  
 ====Making an open study space for Computer Engineering Departments==== ====Making an open study space for Computer Engineering Departments====
Line 43: Line 42:
  
 =====Supporting research activities===== =====Supporting research activities=====
-====Research of National Interest==== +====Faculty incubation center==== 
-  *It is envisaged to start a  new research fund to provide a substantial contribution to  selected research of national interest+  *The estimated cost is Rs10 million. 
 ====Research of Departments==== ====Research of Departments====
-  *At present PEFAA maintain small reserach funds for each department as Fixed Deposits to support student projects to buy items that cannot buy from University money (such as from ebay) where the interest is sufficient to pay about 30000 per year. Chemical Department is yet to start a Fund. You may contribute to start or improve these funds.+  *At present PEFAA maintain small research funds for each department as Fixed Deposits to support student projects to buy items that cannot buy from University money (such as from ebay) where the interest is sufficient to pay about 30000 per year. Chemical Department is yet to start a Fund. You may contribute to start or improve these funds.
  
 =====Making a fund for annual faculty activities===== =====Making a fund for annual faculty activities=====
    *PEFAA is spending about 500,000 each year (some times more) for Faculty activities. If we can have a Fixed Deposit to get that from the interest, then it is not necessary to raise funds for PEFAA regularly through fundraising activities. Out of this 500,000, we provide about 100,000 for students to participate for foreign competitions (Sports, RoboCon) or local events (Spaghetti bridge competition, Career fair etc). We may increase that share too.    *PEFAA is spending about 500,000 each year (some times more) for Faculty activities. If we can have a Fixed Deposit to get that from the interest, then it is not necessary to raise funds for PEFAA regularly through fundraising activities. Out of this 500,000, we provide about 100,000 for students to participate for foreign competitions (Sports, RoboCon) or local events (Spaghetti bridge competition, Career fair etc). We may increase that share too.
  
Last modified: le 2020/12/22 12:18