Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
services_in_need [2019/10/15 11:09]
S.M.K.B. Samarakoon [Refurbishment and/or improving wash room facilities]
services_in_need [2020/12/22 12:18] (current)
Line 6: Line 6:
   * The Faculty do not have a proper student management system for the Faculty. PEFAA was instrumental in purchasing a software by paying annually 1000 USD as a pilot project using funds provided by the  Alumni in Australia. However it is found that ready made software is not capable of handling the stringent and also ad-hoc requirement of the Faculty. So the only option is to develop such a system. For that we need to pay for a computer programmer may be for one year. The cost would be about Rs. 1.2 million   * The Faculty do not have a proper student management system for the Faculty. PEFAA was instrumental in purchasing a software by paying annually 1000 USD as a pilot project using funds provided by the  Alumni in Australia. However it is found that ready made software is not capable of handling the stringent and also ad-hoc requirement of the Faculty. So the only option is to develop such a system. For that we need to pay for a computer programmer may be for one year. The cost would be about Rs. 1.2 million
  
-====Building a Lecture Recording System====+====Installing Lecture Recording Systems====
   *With the advanced digital technology, the function of a class room lectures is being changed drastically. Instead of traditional teacher centered learning, flipped class room model is being promoted. Now the lectures can pre-record lectures and students study at their phase, lecturers can guide them. The classes will be used more to discuss problems. For that we need to subscribe to a lecture recording service. The Faculty needs to identify  suitable technology too. Please contact PEFAA if you are interested to support this project.     *With the advanced digital technology, the function of a class room lectures is being changed drastically. Instead of traditional teacher centered learning, flipped class room model is being promoted. Now the lectures can pre-record lectures and students study at their phase, lecturers can guide them. The classes will be used more to discuss problems. For that we need to subscribe to a lecture recording service. The Faculty needs to identify  suitable technology too. Please contact PEFAA if you are interested to support this project.  
  
Line 15: Line 15:
 =====Infrastructure development===== =====Infrastructure development=====
 ====EOE Pereira Theater==== ====EOE Pereira Theater====
-  *The existing projector room of the theater was refurbished to make it an Audio/Visual control room bringing all cables and controllers to the room. This will facilitate to run the functions smoothly. This was completed by E69-75 batch and handed over to the Faculty on 4-10-2019 on their 50th adversary (of admission). The existing projector screen had wrinkles and hence it was replaced. A new  multimedia projector with wall patch panels and A/V switcher was installed at the control room. The total cost is Rs. 3.0 million. [[https://pefaa.net/services_completed_-_by_batches#e69_batch|..More]]+  *The existing projector room of the theater was refurbished to make it an Audio/Visual control room bringing all cables and controllers to the room. This will facilitate to run the functions smoothly. This was completed by E69-75 batch and handed over to the Faculty on 4-10-2019 on their 50th adversary (of admission). The existing projector screen had wrinkles and hence it was replaced. A new  multimedia projector with wall patch panels and A/V switcher was installed at the control room. The total cost is Rs. 3.0 million. [[https://pefaa.net/services_completed_-_by_batches#e69_batch|Click to read more..]]
   *There is no proper stage lighting system for EOE Pereira Theater.   Professional stage lighting system is required for the functions held in the  theater. The estimated cost is about  Rs. 3 million  and may be implemented in stages spending  Rs. 1 million at a time.   *There is no proper stage lighting system for EOE Pereira Theater.   Professional stage lighting system is required for the functions held in the  theater. The estimated cost is about  Rs. 3 million  and may be implemented in stages spending  Rs. 1 million at a time.
   *The sound system of EOE Pereira Theater is more than 35 years old. It is proposed to install a professional grade array speaker system. The estimated cost is 2.5 million Rupees.   *The sound system of EOE Pereira Theater is more than 35 years old. It is proposed to install a professional grade array speaker system. The estimated cost is 2.5 million Rupees.
Line 22: Line 22:
  
 ====Faculty Board Room==== ====Faculty Board Room====
-  *Refurbishment of the Board Room by providing new furniture, two multimedia projectors,  screens a sound system with 3 Goose neck mics for the head table and two wireless mics was done by E69 (Graduation) batch on 17-08-2019 commemorating their 50th Anniversary of Graduation. [[https://pefaa.net/services_completed_-_by_batches#e66_batch|More..]]+  *Refurbishment of the Board Room by providing new furniture, two multimedia projectors,  screens a sound system with 3 Goose neck mics for the head table and two wireless mics was done by E69 (Graduation) batch on 17-08-2019 commemorating their 50th Anniversary of Graduation. [[https://pefaa.net/services_completed_-_by_batches#e66_batch|Click to read more..]]
  
 ====Audio and Video facilities==== ====Audio and Video facilities====
Line 28: Line 28:
  
 ====Refurbishment and/or improving wash room facilities==== ====Refurbishment and/or improving wash room facilities====
-  *Wash room in the structures laboratory (need major refurbishment. [[https://drive.google.com/drive/folders/1CZNZ3bdOhL_XSV9sJe8Xtb4s_jO4EJMv?usp=sharing|Click for details]] +  *Wash room in the structures laboratory needs major refurbishment. [[https://drive.google.com/drive/folders/1CZNZ3bdOhL_XSV9sJe8Xtb4s_jO4EJMv?usp=sharing|Click for details]] 
-  *Wash room near the library (need major refurbishment)+  *Wash room near the library needs major refurbishment.
   *Installing automatic flushing systems  in three wash rooms on the main corridor The estimated cost is Rs.200,000.   *Installing automatic flushing systems  in three wash rooms on the main corridor The estimated cost is Rs.200,000.
  
Last modified: le 2020/12/22 12:18